Los Angeles Valley College was founded on September 12, 1949 to meet the tremendous growth of the San Fernando Valley during the 1940’s and early 1950’s. The college was officially chartered by the Los Angeles Board of Education in June 1949, and was located on the campus of Van Nuys High School.

LA Valley Jr College Changes its NameOn Opening Day, Valley College had 439 students, which comprised of 254 men and 185 women. The pioneer class was taught by 23 faculty members in five bungalows that served as the original campus. The college library possessed only 150 volumes. The first director of the Valley College was Vierling Kersey.

As the San Fernando Valley grew, the college also grew. In 1950, the college opened its evening division offering only 12 classes. Valley College moved to its permanent 105-acre site on Fulton Avenue in Valley Glen in 1951. The student body was housed in 33 temporary bungalow structures, which increased to 45 bungalows between 1951 and 1956. By 1952, the fall enrollment exceeded 2,300 students. Within the next two years, it developed a fully functioning counseling and community service programs, as well as excellent transfer and vocational programs.

President Coultas with Eleanor RooseveltIn 1954, members of the faculty founded the Athenaeum which began to offer community programs that brought the Los Angeles Philharmonic to the campus. The campus also had internationally known speakers including Eleanor Roosevelt, Clement Atlee, Margaret Mead, and Louis Leakey.

The year 1959 marked the completion of Phase I of the Master Building Plan. In this phase, the following buildings were built Engineering, Chemistry, Physics, Foreign Language, Administration, and the Library. In 1961, Phase II was completed, which included the Music, Theater Arts, Life Science, and Cafeteria buildings. Phase III was completed in 1963. This phase included the Business-Journalism, Math-Science, Art, and Planetarium buildings. Phase IV would not be completed until the 1970's and included the Gymnasiums, Behavioral Science, Humanities, and Campus Center buildings.

In 1969, the Los Angeles Community College District was formed and its nine colleges were separated from the Los Angeles Unified School District. The first independent Board of Trustees was also elected that same year.

LAVC Cheerleaders in 1970sOn the 25th anniversary of the college in 1974, the Valley College Historical Museum was founded. The museum is the only museum totally dedicated to the history of the San Fernando Valley. LAVC celebrated its 50th birthday in 1999 with a variety of events. To commorate its 60th anniversary, the college held an array of activities and special events throughout the 2009-2010 academic year.

Today, Valley College continues to serve the community by offering pathways for certificates, degrees, transfer, and continuing education. Currently, there are about 18,000 students enrolled with 203 full-time faculty and 374 part-time instructors.

As major focal point in the San Fernando Valley, Valley College hosts a number of cultural, recreational and community events throughout the year. The campus has an remodeled Art Gallery that hosts a variety of outstanding student, faculty and other art exhibitions each year. The Music Department presents a number of concerts every year, including choral, symphonic and jazz music, and the Theater Department produces several plays each year. The college’s planetarium, which is maintained by the Earth Science Department, is used for classroom instruction as well as for public astronomy programs. The Journalism Department publishes an award-winning student newspaper called the Valley Star. In addition, many local organizations in the San Fernando Valley and around Southern California also hold functions and events at the college.

LAVC Swimming PoolThe campus has outstanding recreational facilities, which are used by the community, include two gymnasiums, tennis courts, a swimming pool area, and a Fitness Center. Valley College is also home to the Monarch Stadium, which has the only 10-lane Mondo Track in California.

With the passage of Proposition A in 2001, Proposition AA in 2003 and Measure J in 2008, Valley College has embarked on a $626 million building and renovation project. Existing classroom buildings are being updated with new paint, new furniture and smart-classroom equipment, remodeled restrooms, and energy efficient windows. All new campus structures are being built as LEED-certified (Leadership in Energy and Environmental Design) buildings.

Students in Monarch PatioIn 2006 the campus opened its first LEED-certified building, the Maintenance and Operations/Sheriff’s Station, which was the first new building in over 30 years. The award-winning Allied Health and Sciences Center opened in 2008, and has 131 new rooms, tutorial labs, and faculty offices for the departments of Life Science, Physical Science, Earth Science, Anthropology, and Health Science. Other newly opened buildings include a new Student Services Complex, the Child Development and Family Complex, the Belle and Harry Krupnick Media Arts Center, the Library and Academic Resource Center, Community Services Center, and a parking structure.

The college is continuing to grow in the coming years with the addition of several new buildings such as the Valley Academic & Cultural Center (performing/media arts), Athletic Training Facility, Administration & Career Advancement (community workforce development) building, and a Student Union. These building and renovation projects will keep Valley College in the forefront of the San Fernando Valley community colleges.

Closure of Math Science Westside Sidewalk Until May 29

LAVC staff, faculty, and students should be aware that starting on Tuesday, January 28, the sidewalk (that runs north and south) on the westside of the Math Science Building will be temporary closed. The sidewalk will reopen on Friday, May 29. The reason for this closure is due to demolition operations of condemned Bungalows on the Westside of the college campus.

Closure of Math Science Westside Sidewalk Until May 29

The sidewalk that runs north and south on the west side of the Math Science Building will be temporary closed from January 28-May 29.

The slidewalk is being closed due to the activities related to the demolition of the condemned Bungalows westside of the campus near the Math Science Building. Signage will be place to redirect ADA/pedestrian access around the closure.

This project is part of the Bungalow Demolition Project. Read the Bungalow Demolition Construction Notification #3 [PDF]. View photo of the impacted areas [JPG] and site map of the impacted area [PDF]. 

There will be construction equipment noise in the area. However, all noise-related work is restricted between the hours of 8 a.m.-6 p.m.

For more information on the Bungalow Demolition project and this construction activity, please contact Keith Hoard of Build-LACCD at (818) 756-0954 or email Keith Hoard.

 




Posted by: LAVC PR Office on 1/24/2020 4:31:00 PM

Temporary Sidewalk Closures Near Music and Theater Arts

LAVC faculty, staff and students should be aware of sidewalk closures effecting Music Building & Theatre Arts from December 9, 2019-January 17, 2020. The closed sidewalks include south of the Music building east entrance, south of Music building between the Motion Picture Studio, east side of Motion Picture Studio, and east side of the Omega Data Center. Directional signage will be placed to route student traffic during this period.

Temporary Sidewalk Closures Near Music and Theater Arts

Starting December 9, 2019, there are sidewalk closures effecting Music & Theatre Arts buildings. Directional signage will be placed to route student traffic during this period.

This work is part of the Energy Infrastructure Improvements (EII) project. Read the EII Construction Notification #14 with diagram [PDF].

The sidewalk closures are located:

  • south of the Music building east entrance,
  • south of Music building between the Motion Picture Studio,
  • east side of Motion Picture Studio, and
  • east side of the Omega Data Center.

There will also be construction related equipment noise in the area. 

Work is expected to be completed by January 17, 2020.

For more information on the EII Project and this construction activity, please contact Michael Dobrotin of Build-LACCD at (714) 345-7655 or email Michael Dobrotin.

 




Posted by: LAVC PR Office on 12/9/2019 8:00:00 AM

Closure of Lot H, Quad Park, and Bungalows 45-47, 50-52, and 48-49 in Preparation for the Energy Infrastructure Improvement Project

LAVC faculty, staff and students should be aware that Lot H, the Quad Park, and Bungalows 45-47, 50-52, and 48-49 will be closed starting on December 6, 2018 and fencing is being installed as part of the Energy Infrastructure Improvements (EII) project. The EII project includes the demolition of Bungalows 45-47 and 50-52 in preparation for the construction of the Thermal Energy Storage Tank (TES), equipment upgrades in the Central Plant, and construction of underground piping for the north loop located at the north end of Monarch Square.

Closure of Lot H, Quad Park, and Bungalows 45-47, 50-52, and 48-49 in Preparation for the Energy Infrastructure Improvement Project

Starting on Thursday, December 6, mobilization will begin for the Energy Infrastructure Improvement (EII) project. The project includes the demolition of Bungalows 45-47 and 50-52 in preparation for the construction of the Thermal Energy Storage Tank (TES), equipment upgrades in the Central Plant, and construction of underground piping for the north loop located at the north end of Monarch Square.

Construction fencing will be erected around Lot H, the Quad Park, and Bungalows 45-47, 50-52, and 48-49. Pedestrian access into the campus will be available on the west side of Lot H as illustrated on this diagram [JPG].

In addition, Lot H will be used for contractor's offices, parking and lay down, and will be closed to campus parking during the duration of the project. 

For more information on the EII Project, please contact Michael Dobrotin of Build-LACCD at (714) 345-7655 or email Michael Dobrotin.

 




Posted by: LAVC PR Office on 12/3/2018 8:00:00 AM

Closure of Southern Portion of Bungalows in preparation for the Bungalow Removal Project

LAVC students, faculty and staff should be aware that the campus bungalows along Burbank Boulevard are permanently closed as of August 23, 2018. New fencing has been installed around groups of bungalows until they are demolished. There are designated pedestrian pathways through the area to allow for pedestrian access into the campus from Burbank Boulevard and from Parking Lot H.

Closure of Southern Portion of Bungalows in preparation for the Bungalow Removal Project

In preparation for an upcoming Bungalow Removal Project, most of the bungalows along Burbank Boulevard have been permanently closed. 

The new fencing has been installed around groups of bungalows until they are demolished. There are designated pedestrian pathways through the area to allow for pedestrian access into the campus from Burbank Boulevard and from Parking Lot H, as illustrated on the LAVC Campus Map.

In addition, College Sheriff personnel will continue to patrol the area. If you see any suspicious activity, please report it to the LAVC Sheriff's Office at (818) 947-2433. 

For more information regarding this project, contact Tom Lopez in Maintenance & Operations at (818) 947-2301.

 




Posted by: LAVC PR Office on 8/23/2018 8:00:00 AM

Installation of the Valley Academic and Cultural Center Construction Fencing, Permanent Closure of Parking Lot C & Restriping of Parking Lot B 

LAVC faculty, staff and students should be aware that activities related to the construction of the new Valley Academic and Cultural Center (VACC) begins on September 10, 2016. Parking Lot B will be restriped to delete parking stalls and create a east-west roadway in the lot, and new construction fencing for the VACC project will be installed, and Parking Lot C will permanently close.

Installation of the Valley Academic and Cultural Center Construction Fencing, Permanent Closure of Parking Lot C & Restriping of Parking Lot B 

Starting Saturday, September 10, activities related to the construction of the new Valley Academic and Cultural Center (VACC) will begin.

Parking Lot B will be restriped to delete parking stalls and create a east-west roadway in the lot. In addition, new construction fencing for the VACC project will be installed, and Parking Lot C will permanently close. In Parking lot B, a number of parking stalls will be removed, and a new vehicle access lane will be striped to create a new two-lane vehicle pathway north of a new temporary construction fence starting September 10.

Following that, new construction fencing will be installed that will permanently close Lot C, and the current pedestrian pathways between the Music Building and Campus Drive to Parking Lot B will not be accessible. New paths will be identified / added to facilitate pedestrian traffic around the construction site. Please refer to this map [JPG].

For more information on the VACC project and this construction activity, please contact Keith Hoard of Build-LACCD at (818) 756-0954 or email Keith Hoard.

 




Posted by: LAVC PR Office on 9/9/2016 8:00:00 AM